Location | Raubex KZN | Client |
Umlaas Road, Camperdown | OneLogix |
Construction of a 300,000m2 Vehicle distribution facility to store 12,500 vehicles, trucks and agricultural equipment, as well as a 5,500m2 commercial fitment centre to offer services such as pre-delivery inspections, Veridot and tracker systems etc.
Works include:
- 600,000m3 bulk earthworks for cut to fill
- 150,000m3 bulk earthworks for selected layers
- C3 Lime stabilized base layer under G-Block paving
- BSM stabilized base layer under asphalt for car storage
- 80,000m2 G-Block paving
- 190,000m2 Asphalt paving
- 5,500m2 Commercial Fitment Centre
- 1,200m2 Office Administration building