Location Raubex KZN Client
Umlaas Road, Camperdown OneLogix

Construction of a 300,000m2 Vehicle distribution facility to store 12,500 vehicles, trucks and agricultural equipment, as well as a 5,500m2 commercial fitment centre to offer services such as pre-delivery inspections, Veridot and tracker systems etc.

Works include:

  • 600,000m3 bulk earthworks for cut to fill
  • 150,000m3 bulk earthworks for selected layers
  • C3 Lime stabilized base layer under G-Block paving
  • BSM stabilized base layer under asphalt for car storage
  • 80,000m2 G-Block paving
  • 190,000m2 Asphalt paving
  • 5,500m2 Commercial Fitment Centre
  • 1,200m2 Office Administration building

 

Gallery