Hydro cutting (Water jetting) at Ga-Rarankuwa interchange

Company

Roadmac Surfacing

Location

N4 between the R80 Ga-Rankuwa Interchange and the Brits Toll Plaza

Client

Bakwena

Removal of excess bitumen on the existing road surface. This was to improve the micro and the macro texture of the road surface to improve the skid resistance of the surface.

Quantity: 18700m2